UltraViolet Devices High Output UV Device V-Flex Manual de instalación

Busca en linea o descarga Manual de instalación para Redes UltraViolet Devices High Output UV Device V-Flex. UltraViolet Devices High Output UV Device V-Flex Unit installation Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 26
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
This manual covers the preliminary installation, operation and general
maintenance requirements for Aquafine Ultraviolet Water Treatment
Equipment for the following applications:
Disinfection
• Ozone
• TOC Reduction
• Chlorine/Chloramine Destruction
It is imperative that those responsible for the installation of this equipment,
as well as operating personnel, read this manual and carefully follow all
instr uctions and guidelines.
EQEQ
EQEQ
EQ
UIPMENT OPERAUIPMENT OPERA
UIPMENT OPERAUIPMENT OPERA
UIPMENT OPERA
TT
TT
T
ORS ORS
ORS ORS
ORS
AND INSTAND INST
AND INSTAND INST
AND INST
ALL-ALL-
ALL-ALL-
ALL-
ERS MUST COMPLERS MUST COMPL
ERS MUST COMPLERS MUST COMPL
ERS MUST COMPL
Y Y
Y Y
Y
WITH OPERAWITH OPERA
WITH OPERAWITH OPERA
WITH OPERA
TIONTION
TIONTION
TION
AL SAFETY REQAL SAFETY REQ
AL SAFETY REQAL SAFETY REQ
AL SAFETY REQ
UIRE-UIRE-
UIRE-UIRE-
UIRE-
MENTS.MENTS.
MENTS.MENTS.
MENTS.
Aquafine Corporation builds the finest quality ultra violet equipment in the
world. When properly installed and operated, Aquafine ultraviolet
tre atment units will provide many years of service.
Installation,
Maintenance and
Operation Manual
RBE Series
READ THIS MANUAL
PLEASE KEEP FOR PERMANENT REFERENCE
Part No. 115-2, Revised 1-17-03
Vista de pagina 0
1 2 3 4 5 6 ... 25 26

Indice de contenidos

Pagina 1 - READ THIS MANUAL

This manual covers the preliminary installation, operation and generalmaintenance requirements for Aquafine Ultraviolet Water TreatmentEquipment for t

Pagina 2

10Quartz sleeve installationCompression nut assembled on the quartz sleeveStainless socket & lamp end cover designCompression Nut Tool - Rotate cl

Pagina 3 - AT UV LIGHT

11single-ended lamp design for unitsmanufactured after January 1, 1999Once it has been verified that there are no leaks in the system, the UVlamps are

Pagina 4 - RBE series

12double-ended lamp design for unitsmanufactured prior to Jan. 1, 19991. Remove all power to the UV unit.2. Depressurize the system.3. Wear clean cott

Pagina 5 - WARRANTY

13morehigh-temperature (HT) unitsOnce it has been verified that there are no leaks in thesystem, the UV lamps are ready for installation.1. Remove all

Pagina 6

14Lamp socket ID number on end plateSecure lamp socket connector to lampInsert the lamp in a level, horizontal position.Screw the lamp socket cap into

Pagina 7 - GROUNDING

15prior to turning on the UV unit,the following must be verified:• With water flowing through the system, ensure thatthere are no system leaks and no

Pagina 8

16UV lamp operational display panelTo verify that all the UV lamps are operating properly, your UVtreatment unit has been provided with a UV Lamp Oper

Pagina 9

17model S-254 UV optical sensoroptionThe optional S-254 UV optical sensor measures therelative output of ultraviolet light within the UVtreatment cham

Pagina 10 - USD-RBE Series units only

18moreIt is essential that all non-operationallamps be changed immediately tomaintain system efficiency.temperaturesafety control option*The Temperatu

Pagina 11

19using the LED displayIf an LED bulb does not light after you replace a UV lamp, youneed to verify the electrical output of the ballast connected to

Pagina 12

2Installation and Operational Safety ... 3Description of EquipmentRBE Series ...

Pagina 13

20cleaning the unitThe exterior surfaces of the Aquafine UV unit should bekept clean as part of routine maintenance. Use a soft clothwith soap and wat

Pagina 14

21more6. Replace the probe and the coaxial cable.7. Turn the power “on” and resume operation.Whenever new lamps have been installed,follow all resetti

Pagina 15

22Ballast connectorsmoreballast replacementBallast replacement is not part of the UV unit’s routinemaintenance. However, in the event that a ballast n

Pagina 16 - Running Time Meter

23Refer to this nameplate decal on yourunit when ordering parts or service.general part description... part number

Pagina 17 - S-254 UV Optical Sensor

24moredouble-ended units cont. ... part number13. UV Lamps DE Standard 185-BlueTOC Reduction ApplicationsSiz

Pagina 18

25single-ended units cont. ... part number28. UV Lamps SE Validated 185-YellowTOC Reduction ApplicationsSiz

Pagina 19 - Ballast type

26Note: Some units are factory supplied with stainless steel NPT threadedclosure plugs to seal the 1/4” sample ports. Teflon tape is temporarilyapplie

Pagina 20

3DO NOT LOOKAT UV LIGHT8. Do not allow the unit to overheat by operatingwithout water flow. Normal operating temperature forstandard UV units is 50° t

Pagina 21

4To maintain your UV units warranty, please complete andreturn the Warranty Registration Card located in theback pocket of this manual.The following

Pagina 22 - Ballast connectors

5moreAquafine equipment is guaranteed to be free fromdefects in materials and workmanship (excludingultraviolet lamps) for a period of one year from t

Pagina 23

6pressure may rupture and fracture the quartz sleeves.operating pressureStandard units are rated for a maximum operatingpressure of 120 psig (8.24 bar

Pagina 24 - SINGLE-ENDED UNITS

7morecan then proceed with the installation of the quartz sleeves.intermittent operationNever operate the unit without water flow. Permanentdamage is

Pagina 25

8The procedures on this and the following page apply toDouble-Ended (DE), Single-Ended (SE) and High Tempera-ture (HT) RBE units.quartz sleeve install

Pagina 26

9moreOver tightening can break thequartz sleeves or create leaks.Place end of quartz sleeve into threaded nippleRemove socket coversquartz sleeve repl

Comentarios a estos manuales

Sin comentarios